Wednesday, 23 January 2013
Prelim Works Are Underway
A bit of progress on the build with Sewer Encasement completed today.
As much as it was only digging a trench to expose the sewer pipe, encasing with concrete and filling it in, it's progress!
As much as it was only digging a trench to expose the sewer pipe, encasing with concrete and filling it in, it's progress!
Friday, 4 January 2013
House Set Out Complete
House Set out is done, it might look a little cramped on the block, but I'm sure once the slab and frame goes up it will give us a better perspective on space.